冷再生基層工程質(zhì)量檢測及注意事項(xiàng)
來源:http://m.xintangt.com/ 日期:2024-04-11

1、舊路的預(yù)處治

1. Pre treatment of old roads

要求在設(shè)計(jì)和施工時(shí),根據(jù)各路段的不同特點(diǎn),進(jìn)行詳細(xì)的調(diào)查和方案調(diào)整。

Detailed investigation and scheme adjustment are required during design and construction based on the different characteristics of each road section.

20220315030150395.jpg

2、再生深度

2. Regenerative depth

再生后層面的厚度主要取決于再生深度。再生深度太淺,會(huì)使再生層的厚度小于設(shè)計(jì)要求的厚度,層厚是決定路面結(jié)構(gòu)穩(wěn)定性的重要指標(biāo)。因此,必須隨機(jī)鉆孔取樣檢查。如果檢測值偏離設(shè)計(jì)值,應(yīng)及時(shí)調(diào)整冷再生機(jī)深度,使其達(dá)到設(shè)計(jì)深度要求。

The thickness of the regenerated layer mainly depends on the depth of regeneration. If the regeneration depth is too shallow, it will make the thickness of the regeneration layer less than the design requirement, and the layer thickness is an important indicator that determines the stability of the pavement structure. Therefore, it is necessary to randomly drill holes for sampling and inspection. If the detection value deviates from the design value, the depth of the cold regeneration machine should be adjusted in a timely manner to meet the design depth requirements.

3、接縫

3. Seams

為了保證全幅路面的再生施工,相鄰兩個(gè)再生幅面的搭接寬度設(shè)為20cm.對預(yù)先標(biāo)記在路面上的銑刨標(biāo)示線進(jìn)行檢查,所有后續(xù)再生幅面的寬度至少應(yīng)比銑刨轂的寬度窄15cm.若偏差超過10cm,則應(yīng)立即倒退至開始出現(xiàn)偏差的地方,然后沿著正確的銑刨標(biāo)示線重新施工。施工中,應(yīng)盡量減少停機(jī)現(xiàn)象??v向接縫的位置應(yīng)盡量避開行車道上車輛行駛的輪跡。

In order to ensure the regeneration construction of the entire road surface, the overlapping width of two adjacent regeneration surfaces is set to 20cm. The milling marking line pre marked on the road surface should be checked, and the width of all subsequent regeneration surfaces should be at least 15cm narrower than the width of the milling hub. If the deviation exceeds 10cm, it should be immediately reversed to the point where the deviation began, and then reconstructed along the correct milling marking line. During construction, downtime should be minimized as much as possible. The position of the longitudinal joint should try to avoid the wheel tracks of vehicles on the lane as much as possible.

4、路面標(biāo)高

4. Road surface elevation

現(xiàn)場冷再生層作為路面基層時(shí),路面標(biāo)高一般比舊路提高8~10cm,作為路面底基層時(shí),路面標(biāo)高一般比舊路提高23~28cm,由此引起的主要問題有:與結(jié)構(gòu)物的銜接問題;與舊路接頭的接順問題;過村路段的排水問題。

When the on-site cold recycled layer is used as the base layer of the road surface, the road surface elevation is generally 8-10cm higher than the old road. When it is used as the sub base layer of the road surface, the road surface elevation is generally 23-28cm higher than the old road. The main problems caused by this include: connection with the structure; Connection issues with old road joints; Drainage issues on the village road section.

  • 上一條:水泥撒布機(jī)在施工中的細(xì)節(jié)
  • 下一條:銑刨機(jī)租賃的分類和其他應(yīng)用場合
  • 俄罗斯18美女裸交| 尺度最大的色情禁片| 凹凸国产熟女精品视频国语| 无码亚洲成a人片在线观看手机| 办公室秘书跨坐蹭揉h| 真人做爰45分钟| 久久精品国产99国产精品导航| 免费人成视频在线观看| 少爷屁股卡在墙上被侍卫调教| 办公室里呻吟的丰满老师| 精品国产伦一区二区三区在线观看| 成人动漫在线观看| 熟女少妇丰满一区二区| 久久精品国产亚洲av果冻传媒| 年级老师的滋味3中字视频| 青春禁区视频在线观看| 精品综合久久久久久888蜜芽| 美女被强行扒开双腿灌满白浆| 国产欧美va欧美va在线观看| 岳叫我弄进去a片免费视频| 国产精品无码一区二区三区| 性色av一区二区三区人妻| 免费a级毛片无码免费视频120软件| 中文字幕在线观看| 国产精品99精品无码视亚| 挺进同学熟妇的身体| free性欧美极度另类| 一二三四在线观看免费高清| 成人无码www免费视频| 亚洲色欲久久久综合网东京热| 亚洲色成人网站www永久四虎| 精品国内自产拍在线观看视频| 99久热在线精品视频观看| 亚洲av无码一区二区三区乱子伦| 无需付费真人直播视频| 我和岳m大人愉情| 性vodafonewifi另类| 精品国产一二三产品区别在哪| 城中村勾搭老熟女啪啪| 前夫的东西很大和三个人在一起| 久久久受www免费人成|