水泥撒布車和冷再生機(jī)在道路施工過程中的應(yīng)用
來源:http://m.xintangt.com/ 日期:2023-04-17
針對實(shí)際的道路維修,須要水泥撒布車和冷再生機(jī)共同出戰(zhàn)進(jìn)行,大概的修理措施就是先選擇檢驗(yàn)樣本開展抽樣解析,隨后對須要再造的地面開展就地冷再生檢修,隨后在派撒布車上場灑布水泥。那么其具體施工過程是什么呢?接下來水泥撒布車出租廠家小編就來介紹一下。
For actual road maintenance, cement spreaders and cold recycling machines need to work together. The general repair measure is to first select inspection samples for sampling analysis, then carry out on-site cold recycling maintenance on the ground that needs to be rebuilt, and then dispatch spreaders to sprinkle cement on site. So what is the specific construction process? Next, the editor of the cement spreader rental manufacturer will introduce it.
施工流程
Construction process
1、水泥撒布
1. Cement spreading
依照配比布置的混凝土劑量和再造材質(zhì)的高干密度等數(shù)劇,測算獲得每平米的混凝土凈重,選用水泥自動撒布車在地面上均勻?yàn)⒉蓟炷痢?/div>
Calculate the net weight of concrete per square meter based on the dosage of concrete arranged in the ratio and the high dry density of the recycled material. Use a cement automatic spreader to evenly distribute the concrete on the ground.
2、冷再生機(jī)施工
2. Cold regeneration machine construction
對半幅4.6m地面應(yīng)用WR240開展就地再造,2.4m的銑刨寬度2次工作就可成功半幅施工,WR240再生機(jī)銑刨拌和深度為20cm,行駛速度為7m/min。
On site reconstruction of half 4.6m of ground using WR240 can be successfully carried out with a milling width of 2.4m in two operations. The milling and mixing depth of WR240 recycling machine is 20cm, and the driving speed is 7m/min.
水泥撒布車出租
3、平整和夯實(shí)
3. Leveling and compaction
WR240就地再生結(jié)束后,1臺26噸單鋼輪壓路機(jī)隨后開展靜壓1遍,隨后平地機(jī)開展平整;接著,26噸單鋼輪壓路機(jī)開展強(qiáng)振夯實(shí)3遍和弱振3遍進(jìn)行復(fù)壓,終使用26噸膠輪壓路機(jī)夯實(shí)5遍成功終壓。
After WR240 local regeneration, a 26 ton single drum roller will be statically pressed once, and then the grader will be leveled; Next, a 26 ton single steel wheel roller was used to carry out strong vibration compaction for 3 times and weak vibration compaction for 3 times for re compaction, and finally, a 26 ton rubber wheel roller was used to compact 5 times successfully for final compaction.
4、遮蓋養(yǎng)生
4. Covering for health preservation
擊實(shí)結(jié)束的道路,馬上應(yīng)用水車勻稱噴撒一遍水,并遮蓋復(fù)合土工膜開展養(yǎng)生7天,養(yǎng)生期內(nèi)上、下午各撒水一次。
After the compaction is completed, the road should be immediately sprayed with water evenly by a water truck, and the composite geomembrane should be covered for 7 days of curing. During the curing period, water should be sprinkled once in the morning and once in the afternoon.
以上就是水泥撒布車和冷再升機(jī)在現(xiàn)實(shí)公路施工中的施工流程內(nèi)容了,在具體運(yùn)用中,更為強(qiáng)大的動力,更加節(jié)約了土建工程時間,提升了施工效率,防止了由于人工操作導(dǎo)致的不良影響危害,同時很大的節(jié)約了人才資源和時間,充分確保了全部項(xiàng)目的品質(zhì)。更多相關(guān)內(nèi)容就來我們網(wǎng)站http://m.xintangt.com咨詢了解吧!
The above is the construction process of cement spreaders and cold reheaters in real highway construction. In practical applications, they have more powerful power, save more time in civil engineering, improve construction efficiency, prevent adverse effects and hazards caused by manual operation, and greatly save talent resources and time, fully ensuring the quality of all projects. For more related content, come to our website http://m.xintangt.com Consult and understand!
  • 上一條:冷再生機(jī)如何進(jìn)行銑刨及拌和的工作?
  • 下一條:冷再生機(jī)銑刨施工工藝先進(jìn)性的表現(xiàn)
  • 入禽太深免费观看| 特黄a又粗又大又黄又爽a片| 久久天天躁狠狠躁夜夜avapp| 亚洲国产精品sss在线观看av| 啊轻点灬太粗嗯太深了| cao死你小sao货湿透了np| 777米奇色狠狠888俺也去乱| 色一情一乱一伦一区二区三欧美| 日本vs中国vs亚洲看无码| barazza厨房乱战| 杨玉环被啪到高潮| 亚洲乱亚洲乱妇22p| 女人在厨房被添高潮全过程a片| 中文字幕亚洲乱码熟女在线萌芽| 色狠狠一区二区三区香蕉| 久久久久久久久久久| 免费av片| 欧美日激情日韩精品嗯| 日韩吃奶摸下aa片免费观看| 中文字幕精品久久久乱码乱码| 欧美巨大另类极品videosbest| 亚洲av无码国产综合专区| 亚洲熟妇AV日韩熟妇在线| 又大又粗欧美黑人aaaaa片| 久久久久se色偷偷亚洲精品av| 亚洲 欧美 国产 日韩 精品| 人妻少妇久久久久久97人妻| 全职法师第6季全集免费观看| 色88久久久久高潮综合影院| 被六个男人躁到一夜同性| 久久精品夜色噜噜亚洲a∨| 一本久久a久久精品亚洲| a级毛片无码免费真人| 无码人妻黑人中文字幕| 被黑人伦流澡到高潮hnp动漫| 晚秋影院手机在线观看免费| 公喝错春药让我高潮| 男男车车的车车网站w98免费| 舒淇三级无删减版在线播放| 国产精品污www在线观看| 中文无码av人妻久久系列|