  冷再生機作為道路施工的多功能設(shè)備,在處理含水泥材料的工程中能否發(fā)揮作用,需結(jié)合其工作原理、設(shè)備配置及施工工藝綜合判斷。這類設(shè)備通過破碎、拌和、再生等工序,可對水泥相關(guān)材料進行合理處置,但其應(yīng)用效果與操作規(guī)范緊密相關(guān)。

  As a multifunctional equipment for road construction, whether the cold recycling machine can play a role in the treatment of cement containing materials requires a comprehensive judgment based on its working principle, equipment configuration, and construction technology. This type of equipment can dispose of cement related materials reasonably through processes such as crushing, mixing, and regeneration, but its application effect is closely related to operating standards.

  冷再生機處理水泥的核心場景,集中在舊水泥混凝土路面再生與水泥穩(wěn)定類基層施工兩大領(lǐng)域。在舊水泥路面改造中,冷再生機可將破損的水泥混凝土板塊破碎至一定粒徑(通常控制在 30-50 毫米),并與新添加的集料、水泥、粉煤灰等材料均勻拌和,形成再生混合料。這種工藝適用于低等級道路基層或底基層施工,既能消耗廢舊水泥塊,又能減少新材料用量。例如,某省道改造項目中,冷再生機將廢棄水泥路面破碎后,按 1:9 比例摻入新水泥,經(jīng)拌和壓實后,基層強度滿足設(shè)計要求(7 天無側(cè)限抗壓強度≥3.5MPa)。

  The core scenarios of using cold recycling machines to process cement are focused on two major areas: the regeneration of old cement concrete pavement and the construction of cement stabilized base layers. In the renovation of old cement pavement, the cold recycling machine can crush damaged cement concrete slabs to a certain particle size (usually controlled at 30-50 millimeters), and mix them evenly with newly added aggregates, cement, fly ash and other materials to form a recycled mixture. This process is suitable for the construction of low-level road base or subbase, which can consume waste cement blocks and reduce the amount of new materials used. For example, in a provincial road renovation project, the cold recycling machine crushes the abandoned cement pavement and mixes it with new cement in a ratio of 1:9. After mixing and compacting, the base strength meets the design requirements (7-day unconfined compressive strength ≥ 3.5MPa).

  在水泥穩(wěn)定土或水泥改良土施工中,冷再生機可實現(xiàn)水泥與土的高效拌和。設(shè)備通過旋轉(zhuǎn)刀輥將原路面或路基土破碎,同時噴灑定量水泥漿(水泥用量通常為 5%-8%),邊破碎邊拌和,確保水泥與土顆粒均勻接觸。這種工藝常用于公路基層施工,相比傳統(tǒng)路拌機,冷再生機的刀輥轉(zhuǎn)速(一般 100-200 轉(zhuǎn) / 分鐘)與切削深度(可調(diào)至 30 厘米)更適合處理較硬的水泥穩(wěn)定材料,且拌和效率更高(每小時可處理 500-800 立方米)。施工時需注意控制含水率(比最佳含水率高 1%-2%),避免水泥結(jié)塊或拌和不均。

  In the construction of cement stabilized soil or cement modified soil, the cold recycling machine can achieve efficient mixing of cement and soil. The equipment crushes the original road surface or subgrade soil by rotating the knife roller, and sprays a certain amount of cement slurry (usually 5% -8% cement dosage) while crushing and mixing to ensure uniform contact between cement and soil particles. This process is commonly used in highway base construction. Compared with traditional road mixers, the cold recycling machine's blade roller speed (usually 100-200 revolutions per minute) and cutting depth (adjustable to 30 centimeters) are more suitable for processing harder cement stabilized materials, and the mixing efficiency is higher (can process 500-800 cubic meters per hour). During construction, attention should be paid to controlling the moisture content (1% -2% higher than the optimal moisture content) to avoid cement clumping or uneven mixing.

8d07a7b9-5d2a-4c34-9fc3-5b09c8774002

  冷再生機處理水泥的關(guān)鍵在于設(shè)備配置與工藝參數(shù)的匹配。破碎水泥混凝土?xí)r,需更換耐磨刀具(如鎢鋼合金刀頭,硬度≥HRC55),并調(diào)整刀輥間距(通常設(shè)為 20-30 毫米),確保破碎粒徑符合設(shè)計要求。處理水泥穩(wěn)定材料時,設(shè)備需配備精準的計量噴灑系統(tǒng),水泥用量誤差需控制在 ±2% 以內(nèi),同時通過速度傳感器(精度 ±0.5km/h)控制行進速度,保證拌和均勻度。部分冷再生機還具備添加泡沫瀝青的功能,可在處理含水泥材料時同步加入瀝青,形成復(fù)合穩(wěn)定結(jié)構(gòu),提升基層柔韌性。

  The key to using a cold recycling machine to process cement lies in the matching of equipment configuration and process parameters. When crushing cement concrete, it is necessary to replace wear-resistant cutting tools (such as tungsten steel alloy cutting heads, hardness ≥ HRC55) and adjust the spacing between the cutting rollers (usually set to 20-30 millimeters) to ensure that the crushing particle size meets the design requirements. When processing cement stabilized materials, the equipment should be equipped with a precise metering and spraying system, and the cement dosage error should be controlled within ± 2%. At the same time, the travel speed should be controlled by a speed sensor (with an accuracy of ± 0.5km/h) to ensure the uniformity of mixing. Some cold recycling machines also have the function of adding foam asphalt, which can be added synchronously when processing cement containing materials to form a composite stable structure and improve the flexibility of the base course.

  然而,冷再生機處理水泥并非適用于所有場景。對于高強度、高硬度的水泥制品(如橋梁混凝土構(gòu)件),其破碎能力有限(最大破碎強度一般≤30MPa),需先用破碎機預(yù)處理。當水泥材料中含有鋼筋時,冷再生機的刀輥可能被鋼筋纏繞(鋼筋直徑>12 毫米時風(fēng)險顯著增加),需提前人工清除。此外,處理水泥時需嚴格控制再生深度,避免切削過深導(dǎo)致原路基擾動(一般再生深度不超過原結(jié)構(gòu)層厚度的 80%)。

  However, cold recycling machines for treating cement are not suitable for all scenarios. For high-strength and high hardness cement products (such as bridge concrete components), their crushing capacity is limited (maximum crushing strength is generally ≤ 30MPa), and they need to be pretreated with a crusher first. When the cement material contains steel bars, the cutter roller of the cold recycling machine may be wrapped by the steel bars (the risk significantly increases when the steel bar diameter is greater than 12 millimeters), and manual removal is required in advance. In addition, when processing cement, it is necessary to strictly control the depth of regeneration to avoid cutting too deeply and causing disturbance to the original roadbed (generally, the depth of regeneration should not exceed 80% of the thickness of the original structural layer).

  施工后的質(zhì)量控制是冷再生機處理水泥效果的重要保障。拌和完成后,需及時檢測混合料的水泥劑量(采用 EDTA 滴定法,偏差≤±0.5%)、含水率(與最佳值偏差≤±1%)及顆粒級配(通過 4.75mm 篩孔的質(zhì)量百分比控制在 60%-70%)。壓實過程中,需根據(jù)水泥初凝時間(通常 4-6 小時)合理安排工序,采用重型壓路機(噸位≥18 噸)分層壓實,每層厚度不超過 20 厘米,確保壓實度≥97%(按重型擊實標準)。養(yǎng)護期間需覆蓋薄膜或灑水,保持表面濕潤 7 天以上,避免水泥強度損失。

  Quality control after construction is an important guarantee for the effectiveness of cold recycling machines in treating cement. After mixing, it is necessary to promptly detect the cement dosage (using EDTA titration method, with a deviation of ≤± 0.5%), moisture content (with a deviation of ≤± 1% from the optimal value), and particle size distribution (controlling the mass percentage through 4.75mm sieve holes at 60% -70%) of the mixture. During the compaction process, it is necessary to arrange the process reasonably according to the initial setting time of cement (usually 4-6 hours), and use heavy-duty rollers (tonnage ≥ 18 tons) to compact in layers, with each layer thickness not exceeding 20 centimeters, to ensure a compaction degree of ≥ 97% (according to the heavy-duty compaction standard). During the maintenance period, it is necessary to cover the surface with a thin film or sprinkle water to keep it moist for more than 7 days to avoid loss of cement strength.

  本文由冷再生機租賃友情奉獻.更多有關(guān)的知識請點擊:http://m.xintangt.com真誠的態(tài)度.為您提供為全面的服務(wù).更多有關(guān)的知識我們將會陸續(xù)向大家奉獻.敬請期待.

  This article is a friendly contribution from Cold Recycling Machine Rental For more information, please click: http://m.xintangt.com Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.

  • 上一條:冷再生機租賃:解鎖 “地面舞者” 的通過性奧秘
  • 下一條:
  • 色 综合 欧美 亚洲 国产| 寡妇玩xxxxxx猛男| 亚洲无线码一区国产欧美国日产| ten1819第一次处| 亚洲国产精品无码久久一区二区| 精品国产乱码久久久久久呢| 强奷人妻日本中文字幕| 日韩精品一区二区三区在线观看| ten1819第一次处| 亚洲熟妇无码爱v在线观看| 国产手机精品一区| 国产亚洲精品A在线无码麻豆| 清纯校花的被cao日常np| 99久久人妻无码精品系列蜜桃| 无码人妻精品一区二区三区不卡| 久久婷婷国产综合精品| 学生和老师xxxx在教室| 各种姿势被陌生人高h| 精品久久久久久久中文字幕| 资本主义生产关系| 我和两个小婕子做过爱| 亚洲av无码专区亚洲av桃| 野花免费社区在线| 母亲5免费完整高清电视| 屁股眼扒开给客人打烂作文| 中文字幕乱码在线人视频| 把女人弄爽的特黄A大片| 亚洲日韩av在线观看| 富婆性俱乐部纵欲狂| 少妇人妻系列1~100| 人妻哺乳奶头奶水| 同性男在啪的动漫网站| 免费无码AV片在线观看潮喷| 放学后的秘密花园| 亚洲一区av无码少妇电影| 午夜香吻高清观看视频在线| 浪货趴办公桌~h揉秘书| 日日噜噜夜夜狠狠va视频| 亚洲国产精品自产在线播放| 超碰caoporen97人人| 欧美综合缴情五月丁香六月婷|